| Category |
Albums |
Files |
|
3 |
116 |

|
| 116 files in 3 albums and 1 categories with 0 comments viewed 581 times |
| Random files |

Footings for support building. 5 views
|
|

SÅMM site from the air, looking towards the west. Site marked by red dot. 15 views
|
|

0 views
|
|

0 views
|
|

Suppport building interior wall erected & south wall started. 9 views
|
|

Exterior roof materials are installed. 10 views
|
|

0 views
|
|

All foundation walls fininshed. Neoprene sheets on interior of instrument rooms' foundation walls. 7 views
|
|
| Last additions |

Measuring SÅMM site vibrations. 13 viewsMay 21, 2009
|
|

Cooling panels installed on plenum wall of instrument room below acoustic panels. Cover panels not yet installed. 14 viewsMay 21, 2009
|
|

Detail showing water connections and graded perforation of cooling panels on plenum walls. 13 viewsMay 21, 2009
|
|

Soil core sampling at SÅMM site.14 viewsMay 21, 2009
|
|

SÅMM site from the air, looking towards the west. Site marked by red dot. 15 viewsMay 21, 2009
|
|

SÅMM site panorama east of building 212. Looking northwest towards building 201. 14 viewsMay 21, 2009
|
|

Cooling panels installed on ceiling studs. Cover panels not yet installed. 14 viewsMay 21, 2009
|
|

2" thick acoustical panels attached to the plywood on the plenum walls & to the concrete walls. 17 viewsMay 21, 2009
|
|